Using engineering ingenuity and built on existing foundations from a previous building site, 22 Bishopsgate joins the London skyline as the second tallest building in Western Europe.
But, how did the developers predict what people would need from an office of the future and how did they manage to create a “post-Covid” environment when the designs were formulated a decade before the pandemic?
In this episode of our podcast series with Engineering Matters, we understand the vision and story behind 22 Bishopsgate, from the people involved:
- Paul Hargreaves, Construction Director at Lipton Rogers
- Amy Holtz, Head of Sustainability at PLP Architecture
- Diego Padilla-Phillips, Net Zero Lead and Technical Director for Building Structures at WSP
- David Healy, Director for Building Services at WSP
Tune in below to listen to the full episode:
Podcast by Engineering Matters, text courtesy of WSP